I've completed my Ladies of the Sea quilt. At least I think so. I completed all the hand quilting that I had planned to do, but there are a few spots that look a little barren to me. But, I can't decide what to put in those spots to make it feel more complete to me, so I decided to trip it, label it and bind it. So, it't probably done, done, but I reserve the right to change my mind later and add more quilting.
Showing posts with label hand applique. Show all posts
Showing posts with label hand applique. Show all posts
Saturday, January 16, 2021
Ladies of the Sea is DONE!! (I think...)
Saturday, April 4, 2020
Winter Completions, Spring Goals
This documents a few finishes and the list of UFOs I plan to work on this next quarter. Since I've only finished two of the 8 UFOs I listed in the goals for last quarter, none of the projects on the current UFO list is new.
On to the finishes....
And I finally finished this pair of socks that I started in January. I just became disinterested in the pattern and yarn and procrastinated working on them. They turned out lovely, though.
This is the UFO list for spring 2020:
1. Ladies of the Sea
She is in the hoop. I've completed the outline quilting on 14 of the 16 blocks. I'm still contemplating how the background will be quilted, but I'm a long way from having to make that decision. This will not be completed this quarter, it's still on the list so I will make progress.
2. Scrapitude Take 2
My plan was to baste this large top at a quilting retreat that was scheduled for March. However, the retreat was cancelled due to isolation orders because of COVID-19. This quilt is large enough that it does not fit on my kitchen floor. DH suggested the deck. On a pleasant Saturday afternoon, I swept off the deck and got this pin basted. I am currently machine quilting it and expect this will be my next completion.
3. Bright Baby Revisited
Again, still on the list.
4. Handy Dandy Scrappy
The next top to be basted and quilted. I do not, however, have batting for this. Depending on the timing, I may have to take advantage of the curb-side pick up of a local quilt shop that is struggling to remain open.
5. Maxine
Still here, too.
6. Blue Floral
I've been thinking about what I want to do to finish this piece. I'm contemplating what kind of blocks I want to make for the border. I just saw some log cabin blocks placed to make a wave or swag pattern. That has potential.
Tuesday, February 18, 2020
She's Getting Stuff Done!
Although I don't feel like I've gotten a lot done in the past 6 weeks or so, I do have quite a few finishes - just not very many UFO finishes.
OK, first a UFO finish. I did complete the Left-over Stars quilt. I think the finished size turned out to be something like 48" x 75". It's just big enough to cover the top of my double bed with a few inches of overhang. I like it, but I'm not in love with it. Mostly I'm glad to have it done.

My next finish are these two adorable cats. These patterns came courtesy of Val Spiers of Australia. She published the patterns on her blog quite a few years ago and I used 2 of the 4 as decoration for an applique portfolio I made. (Val is currently selling very nice American Girl clothing patterns on Etsy, by the way.) I've always liked the cat patterns and decided to make these as entries to my guild's silent auction in May. They're about 15" square each. I hope they bring in good bids.
The next finish is this little purse. I don't often carry a full-sized purse and my cell phone and my wallet don't always fit into the tiny pockets that are put into women's jeans these days. I had been carrying another bag about this same size, but it's really not very attractive. I bought this fabric to make a full sized purse and had plenty to make this smaller piece for every day. This will do just fine.

And there's this little zipper bag that I completed. This was part of an estate that was donated to the guild. It was mostly assembled. I just finished it and am using it to hold a small knitting project.
That's all for the finishes. And, there was only one official UFO finish. But, progress none-the-less.

In addition to sewing, I started a pair of socks in January. I've sort of lost interest in these once I got used to the stitch and got the leg on the first sock done. I've been much more interested in hand quilting. But, I've picked them back up this week and will try to plod along.
The biggest project is this baby. I finally got Ladies of the Sea all together, completed hand basting and have started quilting. As of today, I've completed outlining the applique and blocks on 6 of the 16 blocks. I'm very much enjoying getting back to hand quilting. I'm still thinking about what design I would like to use for the quilting. There have been some gorgeous machine quilted versions of this that I've seen on the web. I'm not sure how dense machine quilting would translate to hand quilting. Sue Garman's original is quilted with a cross-hatch design and is stunning. I've got quite a bit of outlining to do before I make this decision.
That's what's been keeping me busy lately. I am still entertaining thought of knitting two cardigans. I have the pattern and yarn chosen for each. I just don't know when I will squeeze these into my evening hand stitching time.

My next finish are these two adorable cats. These patterns came courtesy of Val Spiers of Australia. She published the patterns on her blog quite a few years ago and I used 2 of the 4 as decoration for an applique portfolio I made. (Val is currently selling very nice American Girl clothing patterns on Etsy, by the way.) I've always liked the cat patterns and decided to make these as entries to my guild's silent auction in May. They're about 15" square each. I hope they bring in good bids.
And there's this little zipper bag that I completed. This was part of an estate that was donated to the guild. It was mostly assembled. I just finished it and am using it to hold a small knitting project.
That's all for the finishes. And, there was only one official UFO finish. But, progress none-the-less.
In addition to sewing, I started a pair of socks in January. I've sort of lost interest in these once I got used to the stitch and got the leg on the first sock done. I've been much more interested in hand quilting. But, I've picked them back up this week and will try to plod along.
The biggest project is this baby. I finally got Ladies of the Sea all together, completed hand basting and have started quilting. As of today, I've completed outlining the applique and blocks on 6 of the 16 blocks. I'm very much enjoying getting back to hand quilting. I'm still thinking about what design I would like to use for the quilting. There have been some gorgeous machine quilted versions of this that I've seen on the web. I'm not sure how dense machine quilting would translate to hand quilting. Sue Garman's original is quilted with a cross-hatch design and is stunning. I've got quite a bit of outlining to do before I make this decision.
That's what's been keeping me busy lately. I am still entertaining thought of knitting two cardigans. I have the pattern and yarn chosen for each. I just don't know when I will squeeze these into my evening hand stitching time.
Sunday, December 15, 2019
Progress This Fall
The last time I talked about Flower Up was January of 2018. I did complete it in 2018 (I don't remember exactly when), but I never showed a completed photo. I still really like the border on this, although it's deceiving how long applique work on a border takes. I needed to take a photo of this because a friend just bought this to give to her mother for Christmas. I'm glad it's going to a good home.
I've completed all the applique for Ladies of the Sea and trimmed the blocks and borders to size. I'm very thrilled to have this quilt nearing completion. Many thanks to Linda for letting me borrow these gorgeous patterns for the 5 years it's taken me to get this far. If she had not loaned me the patterns, I would have never made the quilt. The patterns are now on the way back to her and I hope she enjoys the process as much as I have. I have just started cutting out the fabric and putting together the 300+ half-square triangle blocks that will make the borders. I was hoping to have the top completed before the end of the year, but I'm not sure if that will happen.
I started a sweater in a lace pattern, but after ripping it out 4 times, I decided I needed more lace practice before I tackled something larger. This cowl was another quick project for lace practice. There a still a few small mistakes at the start of the project, but I can live with that. I will probably tackle a few more small lacy items before I start that sweater again.
The cat quilt is done!!! This quilt started in 1993 as two Internet block exchanges. One of them was black and white cats and the other was browns (I think). They have been languishing in my closet for a very long time. Once I finally decided to put it together, I needed a few extra cats to make the quilt the size I wanted. I think I made 3 or 4. This quilt went with me to a couple of machine quilting classes until I decided on the quilting I wanted on each of the cats and the borders. I'm really happy with how it turned out. When I posted it on Facebook, a friend offered to buy it, so it will be going to her home soon.
Enough for now. I'm still stitching and keeping busy. The next project I picked up is complex hand piecing of M. C. Escher's tessellating lizards. But, I'm contemplating starting a sweater or a new pair of socks or another cowl. And, since my daughter just got engaged, my plan is to make her a full-sized Hawaiian applique quilt, so perhaps I should get started on that since I have the fabric and the pattern. For me, deciding on the next project and starting are always the hardest part.
Until next time...
Wednesday, October 2, 2019
Autumn UFO Club
I'm in again for the Ravelry UFO club. I skipped the summer session because I was traveling so much that I knew I wouldn't get anything much accomplished quite-wise. But, now I'm home for the season, except for a quilt retreat where I hope to make a lot of progress.
So, this is what I'm focusing on for the remainder of the year:
1. Clutter Control
I fully expect to complete this. It is basted and I've started the machine quilting. Each block gets its own personality. Some of them are easier to choose a quilting pattern for than others. I really do like this quilt, but I have been procrastinating on quilting it for some reason. This was started in 1993, so it is definitely time to get this completed.

This is the newest top in my stash. I have the back and binding pieced, so it's just a matter of basting, quilting and finishing. I would like to have this quilt done in time for our guild show in May and I expect to do that.
3. Left Over Stars
This lap-sized quilt needs a border, backing, basting and finishing. This is another quilt I would like to have completed by May. I have the fabric and am planning a keyboard border and white binding. I am taking this to the quilt retreat and will probably finish the top there.
4. Bright Baby Revisited
This was on the list for one of the quilts I wanted to work on in the Spring, but that never happened. It is another of the projects that I will take to the quilt retreat, but it's low priority to finish. I'm looking forward to playing with machine quilting on this.
5. Ladies of the Sea
I am working on the hand applique on the last two ships in this pattern. My second priority at the quilt retreat is to get all the 1/2 square triangles for the sashing completed and get the entire top put together. I have no idea if this is a reasonable goal or not. But, I want to have the top completed before the end of the year, and that is a totally reasonable goal. Then starts the hand quilting. Any bets on how long that will take?
6. Scraptitude Take 2
I completed this top in the spring as a mystery project with my guild. I've made this pattern before and really like the results. This is another quilt that I would like to have done by May. It would be great to have a few from the guild completed and displayed together.
7. Blue Floral
Another long-term UFO that I have dug out of oblivion. I don't expect to have this done by the end of the year, but I want it out of the shadows so I can think about what I want to do with it. I'm taking another machine quilting class in November and the plan is to use this as a show piece for the great skills I will possess upon course completion. (Yes, I can be that delusional!)
These 7 are still a fraction of the 29 UFOs that are still on my list. But, I started the year with a list of 35, so 6 completions isn't too bad. Of course, this doesn't include a few projects that may or may not have been added since I officially counted in January. The focus is on these 7 for now. Then I can reevaluate again.
Wish me luck!
So, this is what I'm focusing on for the remainder of the year:
1. Clutter Control
I fully expect to complete this. It is basted and I've started the machine quilting. Each block gets its own personality. Some of them are easier to choose a quilting pattern for than others. I really do like this quilt, but I have been procrastinating on quilting it for some reason. This was started in 1993, so it is definitely time to get this completed.
2. Handy Dandy Scrappy
3. Left Over Stars
4. Bright Baby Revisited
5. Ladies of the Sea
6. Scraptitude Take 2
7. Blue Floral
Another long-term UFO that I have dug out of oblivion. I don't expect to have this done by the end of the year, but I want it out of the shadows so I can think about what I want to do with it. I'm taking another machine quilting class in November and the plan is to use this as a show piece for the great skills I will possess upon course completion. (Yes, I can be that delusional!)
These 7 are still a fraction of the 29 UFOs that are still on my list. But, I started the year with a list of 35, so 6 completions isn't too bad. Of course, this doesn't include a few projects that may or may not have been added since I officially counted in January. The focus is on these 7 for now. Then I can reevaluate again.
Wish me luck!
Subscribe to:
Posts (Atom)